International Circus Hall of Fame

Shopping Cart

Items in Your Cart

Your cart is empty

Goals and Projects for 2019.

Goals and Projects
        During the year 2019
Project Not started Working on Completed
1 Replace the Main Entrance sign at Rt. 124 X
2 Cut out and replace rotted steel on Bandstand X
3 Mount Jungle panels on Ammo Cage # 77 X
4 Clean the inside of the North Barn X
5 Sandblast and paint RBBB Bandstand X
6 Repair and replace some windows in barns X
7 Replace the Roof on the North Barn X
8 Scrape and Paint the ends of Barns X
9 Cut the tree out of the long cage in back X
10 Update Website X
11 Repaint Concession stand for Downtown X
12 Change Displays inside North Barn X
13 Repaint the RBBB Clown Panel at the Front Office X
14 Replace signs in Hall of Fame Greats X
15 Install new audio signs in display areas X
16 Newsletter Created and Distributed X
17 Repair Knott’s Berry Farm wagon in Shop X
18 Replace Glass window in Cabinet in North Barn X
19
20
21
22

 

 

               Goals and Projects
                       During the year 2018
Project Not started Working on Completed
1 Put new Building Location signs in place X
2 Remove Steel arena from Display X
3 Attend 100th Anniversary of Showman’s Rest X
4 Clean the Tom Dunwoody model from the inside X
5 New tires & Bearings installed on RBBB Bandstand X
6 Repairthree wheels on the Robbins Bros. Baggage Wagon X
7 Replace the Cage # 50 undergear with Spring gear X
8 New material on Betty Hutton Float is hemmed X
9 Cut the tree out of the long cage in back X
10 Update Website X
11 Repaint Concession stand for Downtown X
12 Repaint the Sign turning in from Rt. 124 X
13 Repaint the RBBB Clown Panel at the Front Office X
14 Repaint the Mack Truck cab X
15 Repair Mack Truck engine X
16 Paint bottom ammo cage panel X
17 CMB wagon moved out front X
18 Sig Sautelle has gold leaf added X
19 Henry Keys Music collection is sorted out X
20 CHOF Concession stand in place for summer use X
21
22